Formulating a linear scheduling development index
Journal article   Peer reviewed

Formulating a linear scheduling development index

Hassan Emam, Peter Farrell and Sherif Ahmed
Proceedings of the ICE - Management, Procurement and Law, Vol.169(5), pp.188-198
10/2016

Abstract

infrastructure planning planning & scheduling project management
Construction projects are criticised for overrunning time and cost. Previous studies have identified ineffective planning and scheduling as the most frequently cited cause of delay. Moreover, earlier research debated that network-based planning methods are not suitable for projects with repeating activities. Linear scheduling was argued to be a better tool for simulating projects with repeating activities, such as railways, tunnels, roads and infrastructure. Research efforts on schedule quality and development measurement were devoted to network-based scheduling methods. This study critically reviews current programme quality evaluation models in the literature; the review outcomes are used in interviews with four industry experts to identify suitable criteria for assessing linear schedules. There were 23 criteria confirmed that were then arranged into six groups. Based on the interviews, a questionnaire was distributed, and responses were obtained from 125 participants. Results indicated a high level of agreement on the importance of the defined criteria. They are subsequently ranked according to relative importance. The results show that contractual measures are ranked highest and duration estimation second. In addition, a relationship between level of knowledge and importance of using linear schedules was identified. The study proposes a framework for assessing development level and quality of linear schedules.
url
Link to Published VersionView
Published (Version of record)Publisher sites may require subscription to read content

Metrics

11 Record Views
1 Times Cited - Scopus

Details

Logo image

Usage Policy